Agent Construction · Checks on the paperwork around a building project

Every construction document, read against the records behind it.

Construction paperwork holds up when the permit covers the address, work and schedule the project records; the contractor’s license holds the classification the bid or contract names; the bid answers every scope item at the quantity asked; the contract carries the accepted bid’s price and scope and the project’s parties and schedule; each change order follows from the contract and the approved changes before it; each lien waiver matches the payment it answers; the completion record accounts for the scope and the inspection; and each draw request recomputes against the schedule of values and the earlier payments. Agent Construction reads the paperwork an agent or its principal supplies, checks each document for consistency against the records behind it, and returns a signed verdict with the evidence read and what would change it.

Tool access
0.10 USDC / call
Tools
Eight tools: eight checks
Connection
/mcp
Result
Signed report

The eight tools.

Each tool reads one set of construction paperwork for consistency between documents and decides from the material in the call: the permit with the project record, the license record with the bid or contract, the bid with the request, the contract with the accepted bid and the project record, the change order with the contract and the change log, the lien waiver with the payment record, the completion record with the scope and the inspection, and the draw request with the contract, the schedule of values and the earlier payments go in, and a verdict comes out. The report names the number, party, item, line, amount or date behind every finding, the fix for each, and what would change the verdict. Each check compares the documents as written and leaves structural, engineering and safety judgments, building-code compliance, valuation of work performed and legal advice on contracts, liens and permits to the people who give them.

wever_build-permit-check

Reads
A building permit with its number, project address, holder, each item of work it covers, the day issued and its expiry, beside the project record with the permit number, address, contractor, the work the project calls for, the expiry it records and the work schedule.
The signed report states
A permit number or address unlike the project record, project work the permitted scope does not cover, a recorded expiry later than the permit prints and work scheduled to end after the permit expires, then a permitted item the record leaves out, another holder, an earlier recorded expiry and work scheduled to start before the permit was issued.
Price
0.10 USDC per call
Verdicts
build_permit_mismatchedbuild_permit_partialbuild_permit_unverifiedbuild_permit_matched

wever_build-license-check

Reads
A contractor license record with its number, holder, classifications, status, expiry and the day it was read, beside the bid or contract with the contractor, license number and classification it prints, its date and the day the work ends.
The signed report states
A license number or holder unlike the license record, a classification the license does not hold, a license the record shows inactive, expired, suspended or revoked, and a license expired before or issued after the document date, then a license that expires before the work ends and a record read before the document date.
Price
0.10 USDC per call
Verdicts
build_license_discrepantbuild_license_partialbuild_license_unverifiedbuild_license_matched

wever_build-bid-check

Reads
A contractor bid with each line’s scope item, quantity, unit, unit amount and line amount and its total, beside the project scope or request it answers with each scope item, its quantity and unit, and the day bids are due.
The signed report states
A requested scope item the bid leaves out, a quantity below the request, a line amount unlike its quantity times its unit amount and a total unlike its lines, then a line the request does not list, a quantity above the request, another unit and a bid dated after the due day.
Price
0.10 USDC per call
Verdicts
build_bid_divergentbuild_bid_partialbuild_bid_unverifiedbuild_bid_consistent

wever_build-contract-check

Reads
A construction contract with its parties, project address, price, the bid it cites, its scope and its start and completion days, beside the accepted bid with its total, scope and proposed completion and the project record with its parties, address and schedule.
The signed report states
A price unlike the accepted bid, bid scope dropped or unbid scope added, another contractor, owner or address, a start or completion unlike the project record and a completion before the start, then another cited bid number, a signing after work starts and a completion later than the bid proposes.
Price
0.10 USDC per call
Verdicts
build_contract_divergentbuild_contract_partialbuild_contract_unverifiedbuild_contract_consistent

wever_build-change-order-check

Reads
A change order with its description, price change, time change, previous and new contract totals, new completion day and approvals, beside the contract with its original price, completion day and required approvals and the change log with each entry’s change and status.
The signed report states
Another contract number, a previous or new contract total that does not follow from the original price and the approved changes before it, a log entry with another price or time change, a required approval missing and a new completion day that does not add up, then a change order missing from the log, a log status other than approved, another description and an approval dated before the change order.
Price
0.10 USDC per call
Verdicts
build_change_divergentbuild_change_partialbuild_change_unverifiedbuild_change_consistent

wever_build-lien-waiver-check

Reads
A lien waiver with the waiving party, the paying party, the owner, the project address, the waiver type, the amount, the through date and the day signed, beside the payment record and the contract.
The signed report states
A waiving party unlike the payee, an amount unlike the payment, a through date past the work paid for, an unconditional waiver before the payment clears, a final waiver beside a progress amount and an address or owner unlike the contract, then a through date short of the work paid for, a conditional waiver after the payment cleared, another paying party and a signature before the through date.
Price
0.10 USDC per call
Verdicts
build_lien_mismatchedbuild_lien_partialbuild_lien_unverifiedbuild_lien_matched

wever_build-completion-check

Reads
A completion certificate or punch list record with what it states about the work, its completion day and each item with its status and completion day, beside the contract scope list and the inspection record with each item’s result.
The signed report states
A scope item the record does not account for, an item marked complete that the inspection record shows failed or open, the work stated complete with items open and an item dated complete after the record, then a listed item outside the scope, an item marked complete with no inspection result, an inspection item missing from the record and a completion after the scheduled day, so the record is read against the scope list it answers.
Price
0.10 USDC per call
Verdicts
build_completion_misreportedbuild_completion_partialbuild_completion_unverifiedbuild_completion_faithful

wever_build-payment-check

Reads
A payment application or draw request with each line’s scheduled value, earlier work, work this period, stored materials, completed to date and percent, and its retainage, total earned, earlier certificates and amount due, beside the contract, the schedule of values and the prior payment records.
The signed report states
A contract sum or scheduled value unlike the records, a line outside the schedule of values, a line that does not add up or is billed past its value, and a total, retainage, total earned, earlier certificates or amount due that does not recompute, then a schedule line left off, a misprinted percent and a schedule of values unlike the contract sum.
Price
0.10 USDC per call
Verdicts
build_payment_divergentbuild_payment_partialbuild_payment_unverifiedbuild_payment_consistent

Start with the two free tools.

On https://weverlabs.com/mcp-free, anonymous and with no wallet, two Agent Construction tools map the family and show the permit check at work on synthetic data. Each returns an unsigned result in the family's report shape and ends with a line naming the main tools.

wever_build-snapshot

Reads
Nothing, or the situation in hand, such as hiring a contractor, a change requested or a project closeout, and optionally the names of the documents in hand.
Returns
The eight construction paperwork checks with what each reads, its four verdicts and when each fits, with the checks that fit the situation listed first.
Access
Free on /mcp-free

wever_build-permit-sample

Reads
Nothing, or one synthetic permit: a kitchen remodel, a roof replacement or a deck addition.
Returns
A synthetic building permit that matches its project record beside a mismatched one, both read by the permit check’s own reading, with the permit number, the address, the scope and the expiry annotated with why they pass or fail.
Access
Free on /mcp-free

How agents and people use it.

Your agents

  • Call wever_build-snapshot with the situation in hand to see which checks fit first, before reading any document.
  • Call the check that answers the question on https://weverlabs.com/mcp: when a permit is issued, when a contractor is hired, when bids come in, when a contract is drawn up, when a change order is signed, when a waiver is exchanged for a payment, when the work is certified complete and when a draw request arrives.
  • Read the verdict, the evidence read and what would change it, each report carrying an Ed25519 receipt anyone can verify, signed.
  • Act on the verdict and its findings: ask for a corrected permit, license record, bid, contract, change order, waiver, completion record or draw request, the records behind it, or carry on as checked.

You

  • See each permit, license and bid read against the project records, with the figure on each side named.
  • Read every contract, change order, waiver and draw request against the bid, contract, log, payment or schedule behind it.
  • Verify any check against Wever's published trust key whenever you need to show where a verdict came from.

A worked example

One permit, read against the project record behind it.

The request

{
  "name": "wever_build-permit-check",
  "arguments": {
    "permit": {
      "issuer": "City Building Department",
      "permit_number": "BP-2026-0412",
      "address": "1420 Oak Street, Springfield, IL 62704",
      "holder": "Harbor Build Co.",
      "scope": [
        "Kitchen cabinets and countertops",
        "Electrical rough-in"
      ],
      "issued_on": "2026-10-28",
      "expires_on": "2027-01-31"
    },
    "project": {
      "permit_number": "BP-2026-0412",
      "address": "1420 Oak St, Springfield, IL 62704",
      "contractor": "Harbor Build Company",
      "scope": [
        "Kitchen cabinets and countertops",
        "Electrical rough-in",
        "Plumbing fixture relocation"
      ],
      "permit_expires_on": "2027-01-31",
      "starts_on": "2026-11-02",
      "ends_on": "2027-02-26"
    }
  }
}

What the report returns

Verdict: build_permit_mismatched.

Finding, scope uncovered1 item of project work is not in the scope the permit covers: Plumbing fixture relocation.
Finding, work after expiryThe project record schedules work to end on 2027-02-26, after the permit expires on 2027-01-31.
Fix, scope uncoveredObtain a permit or revision covering each item of work the project calls for, or take the item out of the project.
Fix, work after expirySchedule the work to end by the permit’s expiry, or supply the renewal that extends it.

The permit is mismatched to the project record: scope uncovered and work after expiry.

The project calls for plumbing fixture relocation that the permit’s scope leaves out, and schedules work to end on 2027-02-26, four weeks after the permit expires. The permit number, the address and the holder match the project record, with St read as Street and Co. read as Company. The report states that covering the plumbing work under the permit and ending the work by the expiry moves the verdict to build_permit_matched.

Call it from your agent.

Connect to https://weverlabs.com/mcp and call any of the eight tools. Each call costs 0.10 USDC on Base. Eligible calls share 10 free calls per wallet over a rolling 30 days with the other paid tools. For free access, send X-Wever-Wallet-Proof signed over the exact JSON arguments and the tool route. The payment challenge supplies the x402 terms for a paid call.

Every report comes with an Ed25519 receipt signed with Wever's published trust key. The Agent Construction contract lists the schemas, limits, verdicts and signing details. To create, fund, deliver and release work orders, Agent Work Order Exchange; to hold and release escrowed funds, Agent Escrow Lite; for property titles and inspections, Agent Real Estate; and for invoices and contracts read in general, DiligenceOps checks.

Browse all tools