The request
{
"name": "wever_feedback-incorporation-check",
"arguments": {
"reply": {
"text": "Thanks, noted! Re-pulled the travel total in draft 3."
},
"revision": {
"version": "draft 3"
},
"items": [
{
"id": "f1",
"point": "The travel total on page 2 is 1,240 below the ledger.",
"acknowledged": true,
"response": "changed",
"claimed_change": "Re-pulled the travel total from the ledger",
"in_revision": false
},
{
"id": "f2",
"point": "The cloud variance in table 3 names no cause.",
"acknowledged": true,
"response": "none"
},
{
"id": "f3",
"point": "Move the methodology to an appendix.",
"acknowledged": true,
"response": "declined",
"reason": "The board pack format keeps it inline."
}
]
}
}What the report returns
Verdict: feedback_not_landed.
| Finding, noted without action | 1 item was acknowledged with “thanks, noted” and followed by no change and no reason: f2. |
|---|
| Finding, change claimed absent | 1 change the reply claims is not in the revised work (draft 3): f1 (Re-pulled the travel total from the ledger). |
|---|
| Fix, noted without action | For every item acknowledged with thanks or noted, record what happens to it: the change made, or a decline or deferral with its reason. |
|---|
| Fix, change claimed absent | Make every change the reply claims in the revised work, or correct the reply. |
|---|
The feedback did not land: noted without action and change claimed absent.
The reply to the finance lead says thanks, noted and claims the travel total was re-pulled in draft 3. Draft 3 still carries the old total, so the change is claimed and absent. The cloud variance point was acknowledged and nothing followed it. The methodology point was declined with its reason, so it reads as landed. Making the travel change in draft 3 and answering the variance point with a change or a reason lands the round.